Tracking Shipments & Receiving Goods

Your PO is sent. Now track it from supplier's warehouse to yours.

Shipment Lifecycle

SENT → CONFIRMED → IN PRODUCTION → SHIPPED → IN TRANSIT → DELIVERED → RECEIVED
Day 0 Day 1 Day 10 Day 40 Day 45 Day 50 Day 50

Tracking a Shipment

Before Shipment

Status: IN PRODUCTION (supplier making goods)
Your action:
├─ Nothing yet (wait)
├─ Optionally: Email supplier for update
└─ If worried: Request tracking info early

During Shipment

Status: SHIPPED (left supplier warehouse)

Supplier sends you:
├─ Tracking number: ABC123456789
├─ Carrier: DHL Express
├─ Expected delivery: September 30
└─ Proof of shipment (photo, manifest)

Your action in Synplex:
├─ Update PO status: SHIPPED
├─ Enter tracking number: ABC123456789
├─ Monitor on carrier website (real-time)
├─ Check: On schedule? Any delays?
└─ If delayed: Contact supplier

Day Before Delivery

Tracking shows: "Delivery tomorrow, September 30"

Your action:
├─ Notify warehouse team
├─ Prepare receiving area
├─ Arrange: QC (quality check) staff
├─ Have: Receiving form ready
└─ Schedule: Someone to sign for delivery

Delivery Day

Goods arrive at warehouse

Physical inspection:
├─ Count: Are all units there?
│ └─ Expected: 145 units
│ └─ Received: 145 units ✓

├─ Condition: Damaged goods?
│ └─ Inspect 10% randomly
│ └─ Check: No water damage, dents, etc.

├─ Documentation: Packing slip matches?
│ └─ PO-2024-001: Winter Jacket, 145 units ✓

└─ Sign delivery: Accept goods
└─ Receipt documented

Handling Discrepancies

Scenario 1: Quantity Mismatch

Expected: 145 units
Received: 143 units (2 missing)

Immediate action:
├─ Don't sign yet (or sign "pending verification")
├─ Count again (confirm it's really 2 short)
├─ Check packing slip (does it say 143?)
└─ Take photos (evidence)

In Synplex:
├─ Update received qty: 143 units
├─ Flag: Discrepancy
├─ Note: "2 units missing from shipment"

Email supplier:
"PO-2024-001 received 143 units, expected 145.
2 units missing. Can you ship 2 units separately
or credit our account?"

Resolution options:
├─ Supplier ships 2 units free (replacements)
├─ Supplier credits 2 units on invoice (€90)
└─ You accept loss (last resort)

Scenario 2: Damaged Goods

Received: 145 units, but 5 are damaged (torn jackets)

Immediate action:
├─ Don't accept shipment (or accept with notation)
├─ Separate damaged units
├─ Take photos of each damaged unit
└─ Document in receiving form

In Synplex:
├─ Update received qty: 140 good units
├─ Flag: 5 units damaged
├─ Note: "Ripped seams on arrival"

Email supplier with photos:
"PO-2024-001: Received 5 damaged Winter Jackets.
Photos attached. Can you replace?"

Resolution options:
├─ Supplier ships 5 replacement units
├─ Supplier credits €225 (5 units × €45)
└─ You arrange return (costly, rare)

Scenario 3: Wrong Product

Ordered: Winter Jacket, size M, black
Received: Summer Shirt, size L, blue

Action:
├─ Don't accept (refuse delivery)
├─ Contact supplier ASAP
├─ Verify: Wrong shipment or wrong PO?
└─ Arrange return

Most likely: Supplier shipped wrong item to you
(and your items went to another customer!)

Resolution:
├─ Return the summer shirts (supplier pays return)
├─ Supplier ships correct Winter Jackets
├─ Timeline: 1-2 weeks delay (problematic!)
└─ Consider: Emergency order from secondary supplier

Marking as Received in Synplex

Step 1: Receive PO in System

In Synplex:
├─ Go to Purchase Orders
├─ Find PO-2024-001 (status: DELIVERED)
├─ Click [Receive Goods]

Received qty: 145 units
├─ System pre-fills expected: 145
├─ You confirm: 145 received ✓

Received date: September 30
├─ Auto-filled
└─ Confirm correct

Step 2: Inventory Update

Synplex automatically:
├─ Updates inventory: +145 units
├─ Location: Berlin Warehouse
├─ Status: Back to "Healthy" (if calculated right)
├─ PO status: RECEIVED
└─ Ready for: Invoicing & payment

Before receipt:
├─ Inventory: 280 units (on-hand)
├─ Status: Running Low

After receipt:
├─ Inventory: 425 units (280 + 145)
├─ Status: Healthy ✓ (between Running Low 295 & Overstocked 600)

Step 3: Add Receiving Details

Optional fields in Synplex:
├─ Tracking number: ABC123456789
├─ Carrier: DHL Express
├─ Received by: John (warehouse manager)
├─ Condition notes: "All good, no damage"
├─ Photos: Upload receiving pictures
└─ Location: Berlin Warehouse - Aisle C

Partial & Split Shipments

Scenario: Scheduled Split Delivery

PO: 240 units, split into 2 shipments

Shipment 1: 150 units
├─ Ship date: September 15
├─ Delivery: September 30
├─ In Synplex: Mark as received (150 units)
├─ Inventory: +150 units

Waiting period: 30 days

Shipment 2: 90 units
├─ Ship date: October 15
├─ Delivery: October 30
├─ In Synplex: Mark as received (90 units)
├─ Inventory: +90 units
└─ PO complete

Total: 240 units received in 2 transactions
Synplex tracks: Both shipments to 1 PO

Partial Shipment (Supplier couldn't deliver all)

PO: 240 units, only partial available

Shipment 1: 200 units (all they could make)
├─ Delivery: September 30
├─ In Synplex: Mark as received (200 units)

Backorder: 40 units pending
├─ Expected: October 20
├─ In Synplex: Note backorder
├─ Inventory impact: You're short 40 units
├─ Stock gap risk: Check forecast

Shipment 2: 40 units (backorder fulfilled)
├─ Delivery: October 20
├─ In Synplex: Mark as received (40 units)
├─ PO complete

Quality Control on Arrival

Standard QC (Inspect 10%)

For large orders: Random sample inspection

Example:
├─ Received: 145 Winter Jackets
├─ Sample size: 10% = ~15 jackets
├─ Inspect: Seams, zippers, color, fit
├─ Defect rate: 1/15 (6.7%)

Decision:
├─ <5% defect rate: ACCEPT shipment ✓
├─ 5-10% defect rate: NEGOTIATE replacement
└─ >10% defect rate: REJECT & return

Detailed QC (If Known Supplier Issues)

For suppliers with quality concerns:

Inspect 100%
├─ Check every single unit
├─ Time-consuming but necessary
├─ Use: Supplier reputation is poor
├─ Or: Product is mission-critical

Results:
├─ If poor quality: Reject entire shipment
├─ Contact supplier: "Quality unacceptable, returning all"
└─ Source from alternative supplier next time

Timeline: Shipment to Payment

Day 0: PO Sent
├─ You email supplier

Day 1: Supplier Confirms
├─ Supplier: "Order received, production starts"

Days 2-40: In Production & Shipping
├─ Supplier: Making goods, quality check
├─ Day 40: Goods shipped

Days 40-50: In Transit
├─ Tracking: Monitor on carrier website

Day 50: Delivery
├─ Goods arrive at warehouse
├─ QC: Verify goods
├─ Mark received: In Synplex

Day 50-52: Invoice Arrives
├─ Supplier sends invoice
├─ Amount: €6,525 (matches PO ✓)

Day 52-80: Payment Period
├─ Payment terms: NET 30
├─ Due date: ~October 20
├─ You: Pay by due date

Day 80: Payment Sent
├─ Status: PAID
├─ PO cycle complete

Multi-Shipment Complexity

Multi-Location Delivery

PO: Consolidation from multiple suppliers
├─ 150 Winter Jackets → Berlin Warehouse
├─ 240 Blue T-Shirts → Munich Warehouse

One shipment from supplier:
├─ Contains both products
├─ Arrives at consolidation point

Split delivery:
├─ Berlin: Gets 150 jackets
├─ Munich: Gets 240 shirts

In Synplex:
├─ 1 PO tracks entire shipment
├─ You receive in 2 transactions:
│ ├─ Berlin: Receive 150 jackets
│ └─ Munich: Receive 240 shirts
└─ System updates inventory for each location

Documentation & Record-Keeping

Keep for each shipment:

✓ Packing slip (from supplier)
✓ Tracking info (carrier info, tracking #)
✓ Signed receipt (delivery confirmation)
✓ QC inspection notes (quality check results)
✓ Photos (condition of goods, packaging)
✓ Invoice (from supplier, matching PO)
✓ Payment proof (wire transfer, receipt)
└─ Retention: 7 years (tax & audit purposes)

In Synplex, you can:

├─ Upload documents to PO
├─ Add notes for each shipment
├─ Track history (who received, when)
├─ Flag issues (discrepancies, damage)
└─ Generate reports (for audit)

FAQ

Q: What if goods arrive before PO is sent?

A: Unusual. Confirm with supplier it's for your order. Verify PO matches. Then proceed normally.

Q: What if goods arrive damaged and supplier won't replace?

A: Check your purchase terms. You may have insurance claim option. Last resort: Accept loss (reason to use different supplier next time).

Q: How long do I have to report discrepancies?

A: Immediate best (receipt date). Industry standard: Within 10 days. After that, supplier may not accept claims.

Q: Can I receive goods before paying?

A: Yes (most common). Receive now, pay per terms (NET 30, etc.). Only exception: PRE-PAYMENT terms (pay first).

Q: What if I receive goods but PO doesn't exist in Synplex?

A: Create PO immediately. Match to supplier documents. Then receive in system.


Next Steps

  1. Send your first PO (File 01)
  2. Track the shipment (this file)
  3. Receive goods (mark in Synplex)
  4. Proceed to payments (File 04)